top of page

Repairing road

This street held water about 8 inches deep along roughly a 200 foot section for the last 20 years that we know of. 

The developer created the streets with only 14 inches of drop for the 562 foot stretch and they didn't excavate it or engineer it correctly so it didn't drain. 

The water would sit in the street for two or three weeks at a time or until the city of fort worth water pump trucks were called after any mildly heavy rain.

 

Kids couldn't walk to the bus stop, people couldn't get into their cars, mosquitoes were out of control, and the water flooded many of the houses here. 

 

Start to finish took three weeks, record time working saturdays and sundays!

bottom of page